Wilmington Floor Coatings turtle mascotWilmington Floor Coatings

How it works

The Garage Floor Coating Process

Most garages are coated in a single day, but the result is decided long before the color goes down. Here's every step — with the most time and care spent on preparation, because that's what makes a coating last.

Step by step

Our four-step installation

01

Free on-site quote

We come to you, measure the space, and inspect the slab for cracks, prior coatings, and signs of moisture. You get a flat, written price for the exact system your floor needs — not a vague range or a high-pressure pitch.

02

Diamond grind & repair

We mechanically diamond-grind the entire slab to a coating-ready profile — no acid etching. We moisture-test, then repair cracks, spalls, and control joints with polyurea. This preparation is roughly 90% of why a floor lasts, and it's the step cheap installs skip.

03

Coat & full-flake broadcast

We apply the base coat and broadcast your chosen color flake to full refusal — complete, edge-to-edge coverage. The excess is scraped back and cleaned so the surface is even and locked in for the topcoat.

04

Topcoat & warranty

A UV-stable polyaspartic topcoat seals everything in for a hard, cleanable, sun-proof finish. You can walk on it in about 24 hours and park on it in about 48 — all backed by a written lifetime adhesion warranty.

The part that matters most

Preparation is 90% of a floor that lasts

Almost every coating failure — peeling, bubbling, flaking — comes from bad preparation, not a bad product. A coating can only be as good as its bond to the concrete underneath. That’s why we mechanically diamond-grind every slab instead of acid-etching, moisture-test before we coat, and repair every crack and spall first.

It’s slower and it costs more than skipping it. It’s also the single biggest reason a floor lasts 15 years instead of failing in two — and why we can put an adhesion warranty in writing.

Diamond grinding

A uniform, coating-ready profile — never acid etch.

Moisture testing

Catches vapor problems before they lift a floor.

Crack & spall repair

Polyurea repairs that move with the slab.

Contaminant removal

Oil and old coatings ground away.

Questions

Process FAQs

Still wondering something? Call (910) 304-5773 — a real local person picks up.

Is it really done in one day?+

Most single- and two-car garages are, yes. We grind, repair, coat, broadcast flake, and topcoat in a single visit. Larger or heavily damaged floors, or slabs needing moisture mitigation, may take longer — we'll tell you up front.

How long before I can use the floor?+

You can walk on it in about 24 hours and park vehicles on it in about 48 hours. Polyaspartic's fast cure is a big reason we favor it.

Do you move everything out of the garage?+

The garage needs to be empty for the install. We'll go over exactly how to prepare the space when we schedule your job.

What if you find a moisture problem?+

We test for it before coating. If the slab tests high, we apply a moisture-mitigation primer first so vapor can't push the coating off later. We'll explain any added step and cost before proceeding.

Related reading

Ready when you are

Ready for a floor you'll be proud to show off?

Tell us about your space and we'll send a flat, written quote — same day, no pressure.

Beautiful surfaces, built to last.

Get your free quote

Flat price. Same-day reply.

No spam. No pressure. We reply the same day.

📞 CallFree Quote